Switch to: References

Add citations

You must login to add citations.
  1. An Improved Genetic-Shuffled Frog-Leaping Algorithm for Permutation Flowshop Scheduling.Peiliang Wu, Qingyu Yang, Wenbai Chen, Bingyi Mao & Hongnian Yu - 2020 - Complexity 2020:1-15.
    Due to the NP-hard nature, the permutation flowshop scheduling problem is a fundamental issue for Industry 4.0, especially under higher productivity, efficiency, and self-managing systems. This paper proposes an improved genetic-shuffled frog-leaping algorithm to solve the permutation flowshop scheduling problem. In the proposed IGSFLA, the optimal initial frog in the initialized group is generated according to the heuristic optimal-insert method with fitness constrain. The crossover mechanism is applied to both the subgroup and the global group to avoid the local optimal (...)
    Direct download (2 more)  
     
    Export citation  
     
    Bookmark  
  • An Improved Differential Evolution Algorithm for a Multicommodity Location-Inventory Problem with False Failure Returns.Congdong Li, Hao Guo, Ying Zhang, Shuai Deng & Yu Wang - 2018 - Complexity 2018:1-13.
    No categories
    Direct download (2 more)  
     
    Export citation  
     
    Bookmark   1 citation